How Do Setback and Easement Rules Affect What I Can Build?

Setbacks require minimum distance between structures and property lines; easements grant others legal rights to use portions of your land, both limiting buildable area.

Updated August 25, 2026
Land Development

What's a Conditional Use Permit and How Is It Different From Rezoning?

A conditional use permit allows a specific use within existing zoning under set conditions; rezoning changes the property's overall zoning classification.

Updated August 25, 2026
Land Development

Do I Need a Civil Engineer to Develop Land in Cumberland County?

Most development projects beyond minor administrative approvals require a civil engineer for site design, stormwater plans, and infrastructure engineering.

Updated August 25, 2026
Land Development

What's the Difference Between a Site Plan and a Plat?

A site plan shows proposed building layout and design details for a specific development; a plat is the legal survey document establishing lot boundaries.

Updated August 25, 2026
Land Development

How Much Does It Cost to Develop Raw Land Per Acre?

Raw land development costs per acre vary widely based on utilities, grading, roads, and stormwater needs — a civil engineer's site assessment gives accurate figures.

Updated August 25, 2026
Land Development

What's an Impact Fee and When Is It Charged?

Impact fees are one-time charges on new development to fund infrastructure like roads, schools, and utilities affected by growth from the project.

Updated August 25, 2026
Land Development

What’s the Difference Between Subdividing and Platting Land?

Subdividing is the legal process of dividing land into multiple lots; platting is the recorded survey document that formally establishes those lot boundaries.

ONNIT Realty Group Updated July 30, 2026
Land Development

How Long Does the Land Development Approval Process Take in Cumberland County?

Land development approval in Cumberland County can range from a few weeks for administrative approvals to a year or more for major rezoning and subdivision projects.

ONNIT Realty Group Updated July 30, 2026
Land Development

What Utilities/Infrastructure Does Land Need Before Development?

Developable land generally needs access to water, sewer or septic capability, power, road access, and stormwater management before construction can begin.

ONNIT Realty Group Updated July 30, 2026
Land Development

What’s the Difference Between a Variance and a Rezoning Request?

A variance grants an exception to a specific zoning rule for one property; a rezoning changes the property’s overall zoning classification entirely.

ONNIT Realty Group Updated July 30, 2026
Land Development

How Do I Know If Raw Land Is Buildable?

Determining if raw land is buildable requires checking zoning, soil/perc testing, utility access, flood zone status, and access/easement rights.

ONNIT Realty Group Updated July 30, 2026
Land Development

What Is Rezoning and When Do I Need It?

Rezoning changes a property’s official land-use classification and is required when your intended use isn’t permitted under current zoning.

ONNIT Realty Group Updated July 30, 2026